Internships - 2023-24 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
Nokia Solutions Network India Pvt Ltd Chennai |
Mr.Rayinuthula Bonnu Babu RollNo: 21PA1A0284 |
26/07/2023 | 31/08/2023 | 1month |
Nokia Solutions Network India Pvt Ltd Chennai |
Mr.Pothabathula Pradeep Varma RollNo: 21PA1A0278 |
26/07/2023 | 31/08/2023 | 1month |
Nokia Solutions Network India Pvt Ltd Chennai |
Mr.Nimmagadda Rajeswarachowdary RollNo: 21PA1A0269 |
26/07/2023 | 31/08/2023 | 1month |
Nokia Solutions Network India Pvt Ltd Chennai |
Mr.Podilapu Ajay Kumar RollNo: 21PA1A0276 |
26/07/2023 | 31/08/2023 | 1month |
Nokia Solutions Network India Pvt Ltd Chennai |
Mr.S.T.K.S.G.S. Acharyulu RollNo: 21PA1A0293 |
26/07/2023 | 31/08/2023 | 1month |
Nokia Solutions Network India Pvt Ltd Chennai |
Mr.Medidi Vijaya Babu RollNo: 21PA1A0261 |
26/07/2023 | 31/08/2023 | 1month |
Electric Loco shed East Coast Railway, Visakhapatnam |
Surisetty Rohit RollNo: 22PA5A0227 |
02/08/2023 | 02/10/2023 | 2Months |
Femiconn Integra Hyderabad |
Bellapu Kameswari RollNo: 21PA1A0209 |
21/08/2023 | 20/10/2023 | 2Months |
Digital Instruments & Control Systems Bangalore |
Thota Ushasri RollNo: 22PA5A0229 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Y D S S N Rajeswari RollNo: 21PA1A02B1 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Talakonda Sravani RollNo: 21PA1A0294 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Sirvisetty Harika RollNo: 21PA1A0292 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Parim Rishitha rani RollNo: 21PA1A0272 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Naidu Chaitanya Eswari RollNo: 21PA1A0265 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Kudipudi Bhavya Sri RollNo: 21PA1A0257 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Kompella Akshaya RollNo: 21PA1A0251 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
K Mohana venkata lakshmi Sivani RollNo: 21PA1A0250 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Kimidi Pravallika RollNo: 21PA1A0244 |
13/12/2023 | 13/01/2024 | 1month |
Digital Instruments & Control Systems Bangalore |
Chunduri Udaya Kavya Sri RollNo: 21PA1A0219 |
13/12/2023 | 13/01/2024 | 1month |
EMU Car Shed/Mooula-S.C Railway |
Paleti Tharun RollNo: 21PA5A0218 |
19/07/2023 | 02/08/2023 | 2weeks |
TSSPDCL Secunderabad |
Paleti Tharun RollNo: 21PA5A0218 |
20/06/2023 | 18/07/2023 | 1Month |
Internships - 2022-23 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
Urjanet Energy Solutions Pvt Ltd |
Nageru Yatendra Kumar
RollNo: 20PA5A0216 |
14/11/2022 | 30/06/2023 | 7months |
Urjanet Energy Solutions Pvt Ltd |
SINGAMSETTY VENEESHA SRI SUPRAJA RollNo: 19PA1A0290 |
14/11/2022 | 30/06/2023 | 7months |
Nokia Solutions Network India Pvt Ltd Chennai |
Palivela Kotesh RollNo: 20PA1A0272 |
17/08/2022 | 16/09/2022 | 1Month |
Nokia Solutions Network India Pvt Ltd Chennai |
T Bala Murali Krishna Vamsi RollNo: 20PA1A0290 |
17/08/2022 | 16/09/2022 | 1Month |
Urjanet Energy Solutions Pvt Ltd |
Nageru Yatendra Kumar
RollNo: 20PA5A0216 |
14/11/2022 | 30/06/2023 | 7months |
Urjanet Energy Solutions Pvt Ltd |
SINGAMSETTY VENEESHA SRI SUPRAJA RollNo: 19PA1A0290 |
14/11/2022 | 30/06/2023 | 7months |
Nokia Solutions Network India Pvt Ltd Chennai |
Palivela Kotesh RollNo: 20PA1A0272 |
17/08/2022 | 16/09/2022 | 1Month |
Nokia Solutions Network India Pvt Ltd Chennai |
T Bala Murali Krishna Vamsi RollNo: 20PA1A0290 |
17/08/2022 | 16/09/2022 | 1Month |
Internships - 2021-22 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
AICTE & NEAT Academy
(AWS Cloud Virtual Internship) Online |
Bekkam Rajesh RollNo: 19PA1A0205 |
12-10-2021 | 23-12-2021 | 10weeks |
AICTE & NEAT Academy
(Robotic Process Automation Virtual Internship) Online |
Dasari Tarun Kumar RollNo: 19PA1A0220 |
12-10-2021 | 23-12-2021 | 10weeks |
AICTE & NEAT Academy
(AWS Cloud Virtual Internship) Online |
M.Anand Kumar RollNo: 19PA1A0260 |
12-10-2021 | 23-12-2021 | 10weeks |
Hyderabad Institute of Electrical Engineers
(Electric Vehicles) Online |
Devarapalli Dinesh RollNo: 18PA1A0215 |
24-05-2021 | 29-06-2021 | 5Weeks |
WIPRO Pvt Ltd Hyderabad |
VANGA TEJA VINDU PAVAN SAI SURENDRA RollNo: 18PA1A0267 |
10-03-2022 | 18/07/2022 | 4Months |
Knowledge solutions India |
N.RISHIKA RollNo: 20PA1A0267 |
15/04/2021 | 06/06/2021 | 6weeks |
WIPRO Pvt Ltd Hyderabad |
VANGA TEJA VINDU PAVAN SAI SURENDRA RollNo: 18PA1A0267 |
10-03-2022 | 18/07/2022 | 4Months |
Knowledge solutions India |
N.RISHIKA RollNo: 20PA1A0267 |
15/04/2021 | 06/06/2021 | 6weeks |
Internships - 2020-21 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
EdGate Technologies Pvt Ltd Bangalore under Texas Instruments India University Program. Online |
M.BALAJI RollNo: 18PA1A0238 |
22-12-2020 | 05-01-2021 | 2WEEKS |
EdGate Technologies Pvt Ltd Bangalore under Texas Instruments India University Program. Online |
Abburi Pavani RollNo: 17PA1A0201 |
22-12-2020 | 05-01-2021 | 2WEEKS |
Knowledge solutions India
(Machine learning with AI using Python)
Online |
N.RISHIKA RollNo: 20PA1A0267 |
15-04-2021 | 06-06-2021 | 6weeks |
EdGate Technologies Pvt Ltd Bangalore under Texas Instruments India University Program. |
M.BALAJI RollNo: 18PA1A0238 |
22/12/2020 | 05/01/2021 | 2WEEKS |
EdGate Technologies Pvt Ltd Bangalore under Texas Instruments India University Program. |
Abburi Pavani RollNo: 17PA1A0201 |
22/12/2020 | 05/01/2021 | 2WEEKS |
EdGate Technologies Pvt Ltd Bangalore |
M.BALAJI RollNo: 18PA1A0238 |
22/12/2020 | 05/01/2021 | 2WEEKS |
EdGate Technologies Pvt Ltd Bangalore |
Abburi Pavani RollNo: 17PA1A0201 |
22/12/2020 | 05/01/2021 | 2WEEKS |
Internships - 2019-20 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
BHEL Hyderabad |
V SAI TEJA VARMA RollNo: 16PA1A0279 |
01-06-2019 | 15-06-2019 | 2WEEKS |
Jay Bharat Maruti Ltd Gujarat |
BARRY PRAVEEN RollNo: 16PA1A0208 |
10.06.2019 | 10.08.2019 | 2MONTHS |
Jay Bharat Maruti Ltd Gujarat |
BOKKA VEERA MANIKANTA RollNo: 16PA1A0211 |
10.06.2019 | 10.08.2019 | 2MONTHS |
Jay Bharat Maruti Ltd Gujarat |
CHANAPATHI RAVI TEJA RollNo: 17PA5A0207 |
10.06.2019 | 10.08.2019 | 2MONTHS |
Jay Bharat Maruti Ltd Gujarat |
GORIPARTHI SAI KRISHNA RollNo: 17PA5A0217 |
10.06.2019 | 10.08.2019 | 2MONTHS |
Jay Bharat Maruti Ltd Gujarat |
KALIBOYINA V S GANGADHAR RollNo: 17PA5A0222 |
10.06.2019 | 10.08.2019 | 2MONTHS |
Jay Bharat Maruti Ltd Gujarat |
KADALI RAMARAO RollNo: 17PA5A0220 |
10.06.2019 | 10.08.2019 | 2MONTHS |
Jay Bharat Maruti Ltd Gujarat |
CHUKKA VENKATA KRISHNA RollNo: 17PA5A0209 |
10.06.2019 | 10.08.2019 | 2MONTHS |
NMDC Iron & Steel Plant Chattisgarh |
B.PRANITH RAJ RollNo: 17PA1A0215 |
03-06-2019 | 17-06-2019 | 2WEEKS |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
D RAMAREVANTH RollNo: 17PA1A0225 |
06-06-2019 | 19-06-2019 | 2WEEKS |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
G.V.BHASKAR PRAVEEN RollNo: 17PA1A0230 |
06-06-2019 | 19-06-2019 | 2WEEKS |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
K.ADITYA VARMA RollNo: 17PA1A0238 |
06-06-2019 | 19-06-2019 | 2WEEKS |
BHEL Hyderabad |
D.VISHNU SAI SRI NATARAJ RollNo: 17PA1A0223 |
03-06-2019 | 17-06-2019 | 2WEEKS |
BHEL Hyderabad |
M.SUMANTH RollNo: 17PA1A0259 |
03-06-2019 | 17-06-2019 | 2WEEKS |
BHEL Hyderabad |
V.H.S R SURYA VENKATESH RollNo: 17PA1A02A4 |
03-06-2019 | 17-06-2019 | 2WEEKS |
BHEL Hyderabad |
V.JASWANTH RollNo: 17PA1A02A5 |
03-06-2019 | 17-06-2019 | 2WEEKS |
BHEL Hyderabad |
V.P N V V SATYA CHAITANYA RollNo: 17PA1A02A7 |
03-06-2019 | 17-06-2019 | 2WEEKS |
BHEL Hyderabad |
S.VIJAYA KUMAR RollNo: 17PA1A0287 |
30-05-2019 | 13-06-2019 | 2WEEKS |
BHEL Hyderabad |
N.V S RAM MOHAN RollNo: 17PA1A0266 |
01-06-2019 | 15-06-2019 | 2WEEKS |
BHEL Hyderabad |
K.SAI KISHORE RollNo: 17PA1A0252 |
01-06-2019 | 15-06-2019 | 2WEEKS |
EEE DEPT NIT TIRCHY |
P SAI VENKATA KRISHNA RollNo: 17PA1A0277 |
20-05-2019 | 22-06-2019 | 1MONTH |
National Instruments innovation center Greater Noida |
ADDANKI SOUMYA RollNo: 17PA1A0202 |
03-06-2019 | 13-07-2019 | 1MONTH |
Advent Power Solutions Hyderabad |
SRI KRISHNA CHAITANYA VARMA D RollNo: 18PA5A0224 |
20-05-2019 | 19-06-2019 | 1MONTH |
Advent Power Solutions Hyderabad |
SATYAVOLU VENKAT SAI CHARAN RollNo: 17PA1A0288 |
20-05-2019 | 19-06-2019 | 1MONTH |
Advent Power Solutions Hyderabad |
NULU JAGADEESH GUPTA RollNo: 17PA1A0267 |
20-05-2019 | 19-06-2019 | 1MONTH |
Advent Power Solutions Hyderabad |
AKURATHI NIKHIL RollNo: 17PA1A0203 |
20-05-2019 | 19-06-2019 | 1MONTH |
Internships - 2018-19 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
Nokia Solutions and Networks India Pvt Ltd Tamilnadu. |
Jammu himakanth RollNo: 16PA1A0230 |
02-07-2018 | 27-07-2018 | 1month |
Nokia Solutions and Networks India Pvt Ltd Tamilnadu. |
D.Venugopal RollNo: 16PA1A0218 |
02-07-2018 | 27-07-2018 | 1month |
Andhra Pradesh Power Generation Corporation Ltd. Ibrahimpatnam. |
Mr.G.Nikhil RollNo: 16PA1A0225 |
03-05-2018 | 16-05-2018 | 2weeks |
Andhra Pradesh Power Generation Corporation Ltd. Ibrahimpatnam. |
Mr.K.N.Durgarao RollNo: 16PA1A0239 |
03-05-2018 | 16-05-2018 | 2weeks |
Andhra Pradesh Power Generation Corporation Ltd. Ibrahimpatnam. |
Mr.G.Rohit RollNo: 16PA1A0228 |
03-05-2018 | 16-05-2018 | 2weeks |
Andhra Pradesh Power Generation Corporation Ltd. Ibrahimpatnam. |
Mr.J.Himakanth RollNo: 16PA1A0230 |
03-05-2018 | 16-05-2018 | 2weeks |
Andhra Pradesh Power Generation Corporation Ltd. Ibrahimpatnam. |
Ms.N.Gayathri RollNo: 16PA1A0222 |
03-05-2018 | 16-05-2018 | 2weeks |
Andhra Pradesh Power Generation Corporation Ltd. Ibrahimpatnam. |
Mr.K.Revenkatesh RollNo: 16PA1A0236 |
03-05-2018 | 16-05-2018 | 2weeks |
Andhra Pradesh Power Generation Corporation Ltd. Ibrahimpatnam. |
Mr.K.Sri ram Prakesh RollNo: 16PA1A0237 |
03-05-2018 | 16-05-2018 | 2weeks |
Transmission Corporation of Andhrapradesh Simhachalam. |
Mr.V.Pavan kumar RollNo: 15PA1A02A5 |
22-05-2018 | 31-05-2018 | 10DAYS |
Transmission Corporation of Andhrapradesh Simhachalam. |
Mr.P.Sai Vamsi RollNo: 15PA1A0272 |
22-05-2018 | 31-05-2018 | 10DAYS |
Transmission Corporation of Andhrapradesh Simhachalam. |
Mr.V.L.Ganesh Kumar RollNo: 15PA1A02A4 |
22-05-2018 | 31-05-2018 | 10DAYS |
Transmission Corporation of Andhrapradesh Simhachalam. |
Mr.S.Rohan RollNo: 15PA1A0290 |
22-05-2018 | 31-05-2018 | 10DAYS |
Transmission Corporation of Andhrapradesh Simhachalam. |
Mr.V.Saikrishna RollNo: 15PA1A02A3 |
22-05-2018 | 31-05-2018 | 10DAYS |
Transmission Corporation of Andhrapradesh Simhachalam. |
Mr.S.Leela kumar RollNo: 15PA1A0287 |
22-05-2018 | 31-05-2018 | 10DAYS |
Transmission Corporation of Andhrapradesh Simhachalam. |
Mr.Y.Kumar Raja RollNo: 15PA1A02B1 |
22-05-2018 | 31-05-2018 | 10DAYS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
Mr.S.Devi varaprasad RollNo: 16PA5A0226 |
01-06-2018 | 15-06-2018 | 2WEEKS |
Bsnl Guntur |
S Surya Teja RollNo: 16PA1A0276 |
04-06-2018 | 30-06-02018 | 3weeks |
Bsnl Guntur |
Y Sai Chandradhar RollNo: 16PA1A0282 |
04-06-2018 | 30-06-02018 | 3weeks |
Tebian Electrioc Apparatus Stock Co Ltd Gujarat |
G Uday Kumar RollNo: 15PA1A0234 |
10-12-2018 | 10-05-2019 | 6months |
Tebian Electrioc Apparatus Stock Co Ltd Gujarat |
K Akhil N D Prasad RollNo: 15PA1A0250 |
10-12-2018 | 10-05-2019 | 6months |
Tebian Electrioc Apparatus Stock Co Ltd Gujarat |
Sheik Rahimuddin RollNo: 16PA5A0225 |
10-12-2018 | 10-05-2019 | 6months |
Internships - 2017-18 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
Dr.N.Tatarao Thermal Power Plant Vijaywada |
K V K Vamsi RollNo: 14PA1A0244 |
01-06-2017 | 15-06-2017 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
K Aditya v Sai Sharan RollNo: 14PA1A0245 |
28-11-2-17 | 03-12-2017 | 1week |
BHEL Hyderabad |
M S S S Srinivas Kalyan RollNo: 15PA1A0260 |
23-05-2017 | 08-06-2017 | 2WEEKS |
Internships - 2016-17 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
Vizag Steel Plant Visakhapatnam |
M.rajesh RollNo: 13PA1A0256 |
13-06-2016 | 25-06-2016 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
B.Charanjeevi venkata sai RollNo: 14PA5A0204 |
13-06-2016 | 25-06-2016 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
N Mohan Rao RollNo: 13PA1A0263 |
13-06-2016 | 25-06-2016 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
V Anji Raju RollNo: 13PA1A0296 |
13-06-2016 | 25-06-2016 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
A Eswar Surya Prakash RollNo: 14PA5A0202 |
13-06-2016 | 25-06-2016 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
P.Subrahmanyam RollNo: 13PA1A0278 |
24-05-2016 | 07-06-2016 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
G Ganapathi RollNo: 13PA1A0230 |
24-05-2016 | 07-06-2016 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
Ch Balaji RollNo: 13PA1A02A0 |
24-05-2016 | 07-06-2016 | 2WEEKS |
Solar Circuit Hyderabad |
S Tara reddy RollNo: 13PA1A0288 |
10-06-2016 | 25-06-2016 | 2WEEKS |
Solar Circuit Hyderabad |
R V S K Praveen Kumar RollNo: 13PA1A0286 |
10-06-2016 | 25-06-2016 | 2WEEKS |
Lalitha Electricals & Engineering Services Vijayawada |
N Sanny Babu RollNo: 14PA5A0216 |
16-06-2016 | 25-06-2016 | 10days |
Delta Paper Mills Vendra |
M.Tulasi Ram RollNo: 14PA5A0212 |
10-06-2016 | 18-06-2016 | 9days |
Delta Paper Mills Vendra |
B Shiva Kumar RollNo: 14PA5A0203 |
10-06-2016 | 18-06-2016 | 9days |
Deccan Cements Limited Guntur |
S Poja RollNo: 14PA1A0272 |
16-11-2016 | 20-11-2016 | 5days |
Deccan Cements Limited Guntur |
T Kalyani RollNo: 14PA1A0279 |
16-11-2016 | 20-11-2016 | 5days |
Internships - 2015-16 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
Vizag Steel Plant Visakhapatnam |
Y Aruna RollNo: 13PA1A0299 |
15-06-2015 | 27-06-2015 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
P V Sowjanaya RollNo: 13PA1A0273 |
15-06-2015 | 27-06-2015 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
R Siva Teja RollNo: 13PA1A0287 |
15-06-2015 | 27-06-2015 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
M Narendra RollNo: 13PA1A0261 |
15-06-2015 | 27-06-2015 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
V Manikanta RollNo: 13PA1A0294 |
15-06-2015 | 27-06-2015 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
D Viswanath RollNo: 12PA1A0219 |
15-06-2015 | 27-06-2015 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
Ch Devendra kumar RollNo: 13PA1A0218 |
15-06-2015 | 27-06-2015 | 2WEEKS |
BHEL Hyderabad |
N Ashok sai RollNo: 13PA1A0265 |
16-06-2015 | 30-08-2015 | 45days |
Gail Rajahmundry |
Sai V L Vasavi RollNo: 13PA1A0211 |
10-06-2015 | 24-06-2015 | 2weeks |
NTPC Solapur |
V Durga Vara Prasad RollNo: |
11-06-2015 | 25-06-2015 | 2weeks |
Industrial electricalk systems Coonoor |
P Avinash RollNo: 13PA1A0276 |
22-06-2015 | 24-06-2015 | 3days |
Internships - 2014-15 Academic year | ||||
Company Details | Students | Start Date | End Date | Duration |
---|---|---|---|---|
Dr.N.Tatarao Thermal Power Plant Vijaywada |
M P madhuri RollNo: 11PA1A0224 |
05-06-2014 | 19-06-2014 | 2weeks |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
P hari Pallavi RollNo: 12PA5A0208 |
05-06-2014 | 19-06-2014 | 2weeks |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
S Naga mounika RollNo: 11PA1A0245 |
05-06-2014 | 19-06-2014 | 2weeks |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
S venkateswari RollNo: 11PA1A0241 |
05-06-2014 | 19-06-2014 | 2weeks |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
B Lakshmi Prathima RollNo: 11PA1A0204 |
05-06-2014 | 19-06-2014 | 2weeks |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
R Durga Bahavani RollNo: 12PA5A0210 |
05-06-2014 | 19-06-2014 | 2weeks |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
M Pujitha RollNo: 11PA1A0229 |
05-06-2014 | 19-06-2014 | 2weeks |
Dr.N.Tatarao Thermal Power Plant Vijaywada |
A Padmavathi RollNo: 11PA1A0201 |
05-06-2014 | 19-06-2014 | 2weeks |
Vizag Steel Plant Visakhapatnam |
MD Asif Alikhan RollNo: 11PA1A0227 |
30-06-2014 | 12-07-2014 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
Ch Yashidhar RollNo: 11PA1A0208 |
30-06-2014 | 12-07-2014 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
G upendra RollNo: 11PA1A0215 |
30-06-2014 | 12-07-2014 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
O Bharat RollNo: 11PA1A0235 |
30-06-2014 | 12-07-2014 | 2WEEKS |
Vizag Steel Plant Visakhapatnam |
S k James Srikanth RollNo: 11PA1A0244 |
30-06-2014 | 12-07-2014 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
S N C Raghu ganesh RollNo: 11PA1A0243 |
02-07-2014 | 15-07-2014 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
V narasimha Dinesh RollNo: 11PA1A0250 |
02-07-2014 | 15-07-2014 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
N Pradeep RollNo: 12PA5A0207 |
02-07-2014 | 15-07-2014 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
M Anand Kumar RollNo: 12PA5A0204 |
02-07-2014 | 15-07-2014 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
Y Rama Naidu RollNo: 11PA1A0254 |
02-07-2014 | 15-07-2014 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
G N D Sai rama srinivas RollNo: 11PA1A0216 |
02-07-2014 | 15-07-2014 | 2WEEKS |
BHEL HYDERABAD Hyderabad |
M durga satya Vara prasad RollNo: 11PA1A0231 |
02-07-2014 | 15-07-2014 | 2WEEKS |
HPCL VISAKHAPATNAM |
V satish RollNo: 12PA5A0211 |
25-06-2014 | 07-07-2014 | 2WEEKS |
HPCL VISAKHAPATNAM |
P durga Prasad RollNo: 12PA5A0209 |
25-06-2014 | 07-07-2014 | 2WEEKS |
HPCL VISAKHAPATNAM |
M Lokesh RollNo: 12PA5A0206 |
25-06-2014 | 07-07-2014 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
A J JESU RATNAKAR RollNo: 13PA5A0201 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
A SAI RAMESH RollNo: 13PA5A0203 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
J VINOD KUMAR RollNo: 13PA5A0212 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
G SURESH RollNo: 12PA1A0222 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
J DURGA RAO RollNo: 13PA5A0211 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
M BHARGAV KUMAR RollNo: 12PA1A0251 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
P RAMESH RollNo: 12PA1A0266 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
P SRIDHAR SAI RollNo: 12PA1A0268 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
P JAGADESH RollNo: 12PA1A0272 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
S V D SHARIEF RollNo: 12PA1A0284 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
T VASU RollNo: 12PA1A0289 |
12-01-2015 | 24-01-2015 | 2WEEKS |
Andhrapradesh Gas Power Coirporation Ltd. Vijjeswaram |
V YESWANTH GOUD RollNo: 12PA1A0292 |
12-01-2015 | 24-01-2015 | 2WEEKS |